News for the next winter season 2025/26:
- Replacement of the two-seater Meriz chairlift with a new 4-seater fixed-grip chairlift
The new Doppelmayr lift, which will serve the blue Meriz slope and the toboggan run, will have an alignment carpet and a locking bar system, as well as a special hook for the transportation of sleds. The track of the new lift will follow the existing one. - New photovoltaic system at the Meriz mountain hut
Starting from next winter, the Meriz mountain hut will install a new photovoltaic panel system, a concrete step taken by the ski area mountain huts towards sustainable energy production. In the ski area, which has decided to invest in photovoltaics, panels have already been installed in different strategic spots: on the roofs of some cable cars, mountain huts and administrative offices of the lift companies. - New rental point at the 2001 ski depot
A new ski and snowboard equipment rental point will be inaugurated at the 2001 ski depot, built in December 2024 and located directly at the departure point of the Andalo-Doss Pelà gondola.